Image: Everest BC 5200m Everest BC 5200m
Image: Puja Ceremony BC Puja Ceremony BC
Image: Putting up the Flags over camp for safe climbing Putting up the Flags over camp for safe climbing

Base Camp Puja and packing 10km of Rope
12 April 2005    GPS-pos: °' | °' | Alt: 0 M
In preparation for heading up to ABC and climbing in the mountain we held a Puja ceremony to give us good luck on the mountain. The entire team will begin to move up to ABC 6400m over the next 4-5 days in stages via Interim camp at 5900m.

Previous Dispatches
image

Mountaineering First; $USD 100 fixed ropes to the summit of Everest    11 April 2005
A Mountaineering first – Fixed rope Contract to the summit of Everest $USD 100 per person.
On the Tibetan (northern) side of the mountain the CTMA have contracted Himex, led by Russell Brice (NZ),

image

Arrive Everest Rongbuk Base Camp 5200m    8 April 2005
Finally we can see the objective, 3650m above us Mt Everest at 8850m towers above our BC with it’s dark rocky summit looming above us ominously with high winds tearing across the upper slopes dragging

image

Canons and the hillside Fortress of Shegar    7 April 2005
In 1904-05 the British required most of their 8,000 troops and canons to break down the front gate to this hillside fortress, we took a more subtle approach uses smiles and just walked up the front tr

Later dispatches - Previous dispatches